Deep Freeze

Here are some mid-winter shots of pro shop and clubhouse building construction. All footing work and most poured foundation wall work is complete. Some sections of the clubhouse foundation are tarped and are being heated so that work can continue. At this point, not alot of intriguing subject material for photographs - mainly concrete and snow.



Foundation shell of pro shop with 1st fairway in the background.

Pro shop shell looking west.

This will be the ramp down to golf cart storage beneath the pro shop.


Concrete blankets covering some of the foundation walls of the clubhouse.


Tarped section with heater in foreground.



Looking toward Keller Lake.


More clubhouse walls.


Main entrance from the parking lot.


View of the entire east side lower level.